Figure 11: Housing trajectory graph
Housing Trajectory
The housing trajectory 2011 to 2028 shows past annual dwelling completions and projected annual completions in Hastings against a housing requirement of 3,400 dwellings. It examines, on an annual basis, how many additional dwellings will be needed at any one point in time to meet the housing requirements remaining over the period of the Plan. The trajectory represents the housing land supply position as at 2013/14. Subsequent updates of the housing trajectory and housing land supply information will be published annually in the Local Plan Monitoring Report, available at www.hastings.gov.uk/environment_planning/planning/localplan/monitoring
The forward looking element of the graph, takes account of the potential supply of housing arising from sites where construction activity is on-going, those with a current planning permission, sites that are allocated in the adopted Hastings Local Plan 2004 and unallocated sites that have the potential to contribute to housing delivery.
The data that underpins the trajectory is based on the Strategic housing Land Availability Assessment, and also reflects the latest information gathered from housing developers and land owners regarding build rates and disposal plans.
Local Planning Authorities (LPAs) have to ensure they have a continuous five year supply of deliverable sites available for housing development. National guidance requires that the 5-year supply should include an additional allowance of plus 20%. The five year period starts after the current monitoring year and should include the net additional dwellings expected to come forward from ready to develop sites.
Critically, in order for sites to be considered deliverable and included in the 5 year supply, sites should be:
In compiling the 5-year supply figure, all sites have been assessed against these three factors. The table below shows how the 5-year supply is calculated
Housing Target | 3,400 |
---|---|
Residual target (after deducting 545 completions in 2011/12 & 2013/14*) | 2,855 |
Annual residual target (residual divided by 14 years 2014/15 – 2027/28 | 204 |
5-year target (annual residual x 5 years + 20%) | 1,224 |
5-year housing land supply 2014/15 – 2018/19 | 1,232 |
5-year supply of housing expressed as a % | 100.6% |
Table 10: Calculating 5-year housing land supply
*Completions for 2013/14 are estimates.
The current assessment of sites shows that in terms of a five year supply, there is the potential for some 1,232 dwellings to come forward in this period. This is in excess of the five year supply target number 1,224.