< Previous | Next >

16. SHERBORNE

16.1 INTRODUCTION

16.1.1 The northern area of the district is centred on the historic market town of Sherborne. The area has strong links with Yeovil (in South Somerset) to the west, but also good connections with Dorchester to the south, Wincanton (also in South Somerset) to the north, and Sturminster Newton and Shaftesbury (both in North Dorset) to the east.

16.2 VISION FOR SHERBORNE

16.2.1 In 2031 Sherborne will:

  • conserve and enhance the outstanding historic and cultural character of the town and its landscape setting;
  • have a thriving arts and cultural offer;
  • use the historic interest, arts and cultural activities as a basis for local tourism, with the town becoming a key inland visitor destination;
  • have a better balance of housing and jobs;
  • have improved accessibility to public transport with enhanced traffic management;
  • be a place where residents of all ages are given the opportunity to use a wide range of community facilities;
  • continue to benefit from the important national and international educational establishments in the town;
  • support high quality design in the built environment;
  • continue to maintain a physical and visual separation from Yeovil.

MAIN DEVELOPMENT OPPORTUNITIES

16.2.2 There are a number of developments either previously allocated in the 2006 Local Plan or with the benefit of planning permission that will help achieve this vision, and further proposals that should come forward within the plan period. These include:

  • Land at Barton Farm – an allocation in the 2006 Local Plan for housing, employment and community uses, that has outline permission;
  • Town Centre Regeneration – land to the rear of Sherborne House has planning permission for 44 new homes. Redevelopment of the former tennis courts as a new arts centre with access off the Old Market Place (to the rear of Cheap Street) has also been permitted. There is scope for further expansion of town centre uses onto the existing Newland car park;
  • Land at Sherborne Hotel – was allocated in the 2006 Local Plan for employment development, and remains relevant as an important gateway site to the town;
  • Former gasworks site, Gas House Hill – was allocated in the 2006 Local Plan for employment. The site is well located, close to the town centre and railway station. However it has not come forward due to a number of reasons linked to viability and access. Some of the remediation work has now been done, and a mixed use development is considered the most feasible solution to redeveloping this brownfield site.

16.3 BARTON FARM URBAN EXTENSION

16.3.1 Land at Barton Farm was allocated in the 2006 Local Plan to meet the development needs of Sherborne up until 2016. The allocation was intended to deliver about 230 new homes, 4.2ha of employment workspace and community, leisure and recreation facilities. The Barton Farm Development Brief adopted in 2007 established a number of principles for development, based upon the local plan policies and public consultation. Although this site now has the benefit of outline planning permission (subject to the signing of a legal agreement) for a mixed-use development of up to 279 dwellings with community uses and employment, the allocation will be retained in the plan until such a time as the development is built out.

SHER 1. LAND AT BARTON FARM

i) Land at Barton Farm, Sherborne, as shown on the policies map, is allocated for a comprehensive mixed use scheme for employment and residential development together with public open space. Development will be phased in accordance with the adopted Barton Farm Development Brief 2007, and will include the following:

  • comprehensive landscape treatment to the boundaries of the site and within the development or enhancement of the site;
  • the land should be developed comprehensively in association with employment uses and the provision of public open space;
  • the phased development of the land to ensure that the employment facilities and the public open space are brought forward ahead of or in association with the housing development;
  • the completion of junction improvements to the Sheeplands Lane/ Yeovil Road A30/ Horsecastles Lane (A352) junction and the widening of Sheeplands Lane to allow for two way traffic along part of its length;
  • the provision of pedestrian access routes and cycle ways to the town centre, schools and other local facilities such as bus stops and the train station; and the provision of public transport infrastructure;
  • the housing development should include a range of sizes, types and tenures including affordable housing.

16.4 THE PROVISION OF COMMUNITY INFRASTRUCTURE WHERE APPROPRIATE TO INCLUDE OPEN SPACE AND EDUCATIONAL FACILITIES; SHERBORNE TOWN CENTRE

16.4.1 The car park areas to the rear of Cheap Street offer development potential, and are likely to be the most suitable location for the expansion of the town centre area, if the need for additional retail floorspace arises. The provision of public car parking close to the town centre is, however, also important to its continuing success, and therefore any development will need to take this into account.

16.4.2 Any development should be well-integrated with the town centre, with adequate connections to Cheap Street, and preserve and enhance the character and appearance of the conservation area.

SHER 2. FUTURE TOWN CENTRE EXPANSION

i) Land at Newland Car Park North and Newland Car Park South, as identified on the policies map, will be the preferred location for future expansion of the town centre area. Any scheme will need to retain the existing level of public car parking.

16.5 LAND AT SHERBORNE HOTEL

16.5.1 This site was previously allocated in the 2006 Local Plan for employment uses (in addition to retaining the hotel use), and was not considered suitable for housing due to its gateway location and proximity to the A30. The hotel use is considered to be important locally in sustaining tourism and accommodating visitors to the local schools and businesses. This is reflected in the vision statement for Sherborne, which sees the the town becoming a key inland visitor destination. The existing hotel building is however dated both in structure and design, with the potential for improvement, expansion or redevelopment. The open area of land to the front of the hotel is potentially underused and could accommodate either the replacement and/or enlargement of the hotel or the introduction of complementary business uses. It is not considered that a large scale retail development would be complementary to the existing hotel use or appropriate in terms of enhancing the tourism offer in the town, particularly at such an important gateway location.

16.5.2 Development will require improvements to the existing vehicular access with Horsecastles Lane, and a pedestrian footway from the site entrance to the A30 Yeovil Road should be constructed. The site is visually prominent in the street scene and therefore any development will need to be to a high specification in terms of design and landscaping. The design should reflect the gateway status of this location.

SHER 3. LAND AT SHERBORNE HOTEL

i) Land at Sherborne Hotel, as shown on the policies map, is a key gateway site, that is allocated for the retention and/or expansion of the hotel use and other appropriate business uses.

16.6 FORMER GASWORKS SITE, GAS HOUSE HILL

16.6.1 The former gas works site was previously allocated in the 2006 Local Plan for employment. The site is well located, close to the town centre and railway station. However it has not come forward due to a number of reasons linked to viability, although remediation work has been undertaken to address the contamination.

16.6.2 A mixed use allocation for both housing and employment should provide greater flexibility to allow this site to be redeveloped effectively and reduce the potential impact on the amenity of the existing homes on Gas House Hill.

16.6.3 The access arrangements will need to be improved, as the current arrangements are narrow and partially within the flood plain. The site slopes steeply down from New Road, and has a strong treed boundary to the north, west and south which should be retained to minimise impact on wider views. There may be structural problems with the retaining wall along the southern boundary which would need to be resolved.

SHER 4. THE FORMER GASWORKS SITE, GAS HOUSE HILL

i) Land outside flood risk zone at the former Gasworks on Gas House Hill, as shown on the policies map, is allocated for housing and employment.
ii) Any development will need to adequately address flood risk and highway access. A landscape strategy will be required to ensure that there is no significant adverse impact on wider landscape views.




< Previous | ^ Top | Next >