< Previous | Next >

4 HOUSING SITE ALLOCATIONS

4.1 The Core Strategy identifies the need for the provision of 4,500 dwellings in Three Rivers between 2001 and 2026. Policy CP2 sets out that housing provision will be made primarily from within the existing urban area (approximately 75% of total housing development between 2001 and 2026) and also from housing sites at the most sustainable locations on the edge of existing settlements, in the Green Belt (approximately 25% of total supply between 2001 and 2026). Core Strategy policy CP8 requires all development to provide, or make adequate contribution towards infrastructure and services.

4.2 The Core Strategy Place Shaping Policies set out that of the District's housing requirements over the plan period:

  • Approximately 15% should be provided in the principal town (Rickmansworth),
  • Approximately 60% should be provided in the Key Centres (South Oxhey, Croxley Green, Abbots Langley, Chorleywood, Leavesden and Garston and Mill End),
  • Approximately 24% should be provided in the Secondary Centres (Kings Langley, Carpenders Park, Eastbury, Maple Cross, Moor Park and Oxhey Hall) and
  • Approximately 1% in the Villages (Bedmond and Sarratt).

4.3 Core Strategy policy CP2 states that in identifying sites for future development, the Site Allocations document will set out an indicative phasing strategy for the development of sites. This strategy will take into account the policies and parameters established through the Core Strategy and will take into account the sustainability of each site, the deliverability of housing on the site and likely infrastructure requirements. Sites which contribute better to sustainability objectives, are deliverable, and will not have infrastructure requirements that will require a long lead-in time will be phased earlier than sites that contribute less well to sustainability objectives, are not deliverable in the shorter term or require a lead-in period for infrastructure provision.

4.4 Appendix 2 of the Core Strategy sets out housing site selection criteria to assist in the assessment of potential housing sites. It should be noted that while the criteria and score of how well a site performs in relation to the range of planning and sustainability criteria have informed the Council's consideration of the site, in coming to a decision the Council have considered each site on its merits and taken into account site specific circumstances. It is not the case that higher scoring sites have automatically been taken forward and that lower scoring sites have not been taken forward.

4.5 At April 2012, provision has been made for 2,898 dwellings, excluding the outline planning permission that has been granted for Leavesden Aerodrome and including a windfall allowance of 38 dwellings per year between 2021 and 2026. The Site Allocations document sets out how the Council will make provision to meet the Core Strategy requirement.

4.6 In view of the need for new housing in Three Rivers, the benefits of building new homes in Three Rivers would be undermined if the stock of existing housing were to reduce. Therefore the Council's starting point is to protect existing housing in the District.

Identification of Housing Sites

4..7 Sites for housing have been identified through the Strategic Housing Land Availability Assessment (2008) and the Strategic Housing Land Availability Assessment Update (2010) and through sites submitted to the Council during previous stages of consultation on the Core Strategy and Site Allocations Development Plan Document. Information on previous consultation and details including site scores against the housing site selection criteria of all sites that have been considered, including those which have not been taken forward are set out in the Site Allocations Supporting Information report available on our website at www.threerivers.gov.uk.

4.8 Many sites may have development potential, but this document cannot identify and allocate every site. Sites considered for allocation and inclusion in the Site Allocations document are generally above 0.1ha as the Site Allocations document needs to focus on sites likely to make a significant contribution to the objectives of the Core Strategy. National and local planning policies will guide future planning decisions on other sites through the planning application process.

Housing Site Allocations

4.9 Details of individual sites allocated for housing development are set out below. Appendix 2 shows housing site allocations alongside all other allocations by parish area.

 

POLICY SA1: HOUSING SITE ALLOCATIONS

Permission will not be granted for development resulting in a net loss of housing unless conversion to other uses is necessary to provide a small-scale facility and provided the surrounding residential area is not significantly adversely affected.

Allocated housing sites will be safeguarded for housing development.

Sites should be developed at an overall capacity which accords generally with the dwelling capacity given for that site.

Proposals for the development of sites should have regard to the phasing strategy for the site, Core Strategy Policy CP2 and the latest monitoring information on housing supply which may result in alteration to the indicative phasing of sites through the Annual Monitoring Report.

The earlier release of identified housing sites will only be considered if:

  1. The Annual Monitoring Report projects that there will not be a five year supply of land for    housing
  2. The sites can realistically be delivered in the short-term
  3. It can be clearly demonstrated that the early release of sites will achieve significant benefits in terms of sustainability and other objectives of the Core Strategy
  4. It does not unduly impact on other sites coming forward in accordance with the Spatial Strategy.

In the case of sites not being required in the plan period to 2026 sites will be safeguarded for future development beyond the plan period.

Development of identified housing sites should provide affordable housing in accordance with Core Strategy policy CP4.

Housing Site Allocations

Site Ref

H(1)

Site

Kings Langley Employment Area

Housing Site Allocations

Current Use

Industrial units, open space and derelict land

Dwelling Capacity

100

Green Belt

Yes (part of site)

Phasing

2012-2026

 

Comments

Individual employment sites within the broad area have not been specifically identified.

Minimum 8m buffer must be provided to River Gade.

Part of the site (north of Masters Yard) is identified as a wildlife site. Measures to avoid adverse impacts and enhance biodiversity will need to be provided by developers, supported by adequate ecological survey.

A number of waste sites are located to the north of the site. Parts of the site are in Source Protection Zones 1 and 2. A preliminary risk assessment to determine whether there is contamination of the site and whether further remediation works will need to be undertaken would be required to support planning applications on the site

Primrose Hill Playing Fields would need to be retained, or replaced with at least equivalent facilities, as part of any redevelopment.

Site Ref

H(2)

Site

Mansion House Farm Equestrian Centre, Bedmond Road, Abbots Langley

 House Site Allocations

Current Use

Mansion House Farm Equestrian Centre

Dwelling Capacity

15

Green Belt

Yes

Phasing

2016-2020

 

 

 

 

 

Site Ref

H(3)

Site

Pin Wei. 35 High Street, Abbots Langley

 Housing Site Allocations

Current Use

Restaurant

Dwelling Capacity

10

Green Belt

No

Phasing

2021-2026

 

 

 

 

 

 

Site Ref

H(4)

Site

Furtherfield Depot, Furtherfield, Abbots Langley

Housing Site Allocations

Current Use

Depot site

Dwelling Capacity

15

Green Belt

Yes

Phasing

2016-2020

Comments

The site lies within Source Protection Zone 2. A preliminary risk assessment to determine whether there is contamination of the site and whether further remediation works will need to be undertaken would be required to support planning applications on the site.

Site Ref

H(5)

Site

Leavesden Aerodrome, Abbots Langley

 Housing Site Allocations

Current Use

Open land including an area with historic planning permission for office space

Dwelling Capacity

425

Green Belt

Yes

Phasing

2012-2020

Comments

Site has outline planning permission for 425 dwellings.

 

Site Ref

H(6)

Site

Hill Farm Industrial Estate, Hill Farm Avenue, Leavesden

 Housing Site Allocations

Current Use

Industrial units

Dwelling Capacity

30

Green Belt

Yes (part of site)

Phasing

2016-2026

Comments

The site lies within Source Protection Zone 3. A preliminary risk assessment to determine whether there is contamination of the site and whether further remediation works will need to be undertaken would be required to support planning applications on the site.

 

Site Ref

H(7)

Site

Langleybury House/School, Langleybury

 Housing Site Allocation

Current Use

Disused school/house

Dwelling Capacity

20

Green Belt

Yes

Phasing

2016-2020

Comments

The site comprises former modern school buildings and their associated hardstanding. Their replacement by housing would be considered not inappropriate development within the Green Belt.

 

 

 

Site Ref

H(8)

Site

Royal British Legion, Church Lane, Sarratt

Housing Site Allocations

Current Use

Hall

Dwelling Capacity

10

Green Belt

Yes

Phasing

2012-2015

Comments

Site is within Sarratt Village and is allocated as a rural exception site to provide affordable housing.

Site Ref

H(9)

Site

33 Baldwins Lane, Croxley Green

Housing Site Allocations

Current Use

Car sales

Dwelling Capacity

10

Green Belt

No

Phasing

2016-2026

Comments

The site lies within Source Protection Zone 1. A preliminary risk assessment to determine whether there is contamination of the site and whether further remediation works will need to be undertaken would be required to support planning applications on the site.

Site Ref

H(10)

Site

Killingdown Farm, Croxley Green

 Housing Site Allocations

Current Use

Farmland/ buildings

Dwelling Capacity

140 - 180

Green Belt

Yes

Phasing

Post 2026

Comments
Development would need to relate to the conservation area and listed building.

The site lies within Source Protection Zone 2. A preliminary risk assessment to determine whether there is contamination of the site and whether further remediation works will need to be undertaken would be required to support planning applications on the site.

Site Ref

H(11)

Site

50-52 New Road, Croxley Green

 Historical Site Allocations

Current Use

Mechanics and Fuel Station

Dwelling Capacity

10

Green Belt

No

Phasing

2021-2026

Comments
The whole site is located above a principal aquifer (chalk), which is highly sensitive to contamination. A preliminary risk assessment to determine whether there is contamination of the site and whether further remediation works will need to be undertaken would be required to support planning applications on the site.

Site Ref

H(12)

Site

Former Yorke Road School, Yorke Rd, Croxley Green (conversion)

 Historical Site Allocations

Current Use

Disused primary  school/office use

Dwelling Capacity

5

Green Belt

No

Phasing

2012-2015

Comments

Allocation is based on retention and conversion of existing building.

 

 

 

Site Ref

H(13)

Site

Croxley Station Car Park and Timber Yard

 Historical Site Allocations

Current Use

Car Park and Timber Yard

Dwelling Capacity

25

Green Belt

No

Phasing

2016-2020

Comments
Development may include retail store with residential above.

Development would need to safeguard parking provision for the station.

The site lies within Source Protection Zone 1. A preliminary risk assessment to determine whether there is contamination of the site and whether further remediation works will need to be undertaken would be required to support planning applications on the site.

Site Ref

H(14)

Site

Land Rear of The Queens Drive, Mill End

 Housing Site Allocations

Current Use

Open land

Dwelling Capacity

25

Green Belt

No

Phasing

2012-2015

 

 

 

 

 

 

Site Ref

H(15)

Site

Garages Rear of Drillyard, West Way, Rickmansworth

 Housing Site Allocations

Current Use

Garages

Dwelling Capacity

3

Green Belt

No

Phasing

2021-2026

Comments

The site lies within Source Protection Zone 3. A preliminary risk assessment to determine whether there is contamination of the site and whether further remediation works will need to be undertaken would be required to support planning applications on the site.
 

Site Ref

H(16)

Site

Long Island Exchange, Victoria Close, Rickmansworth

 Housing Site Allocations

Current Use

Garage and bar/hotel

Dwelling Capacity

50

Green Belt

No

Phasing

2016-2020

 

 

 

 

 

 

Site Ref

H(17)

Site

Police Station, Rectory Road, Rickmansworth

 Housing Site Allocations

Current Use

Former police station

Dwelling Capacity

20

Green Belt

No

Phasing

2016-2020

 

 

 

 

 

 

Site Ref

H(18)

Site

Royal British Legion, Ebury Road, Rickmansworth

 Housing Site Allocations

Current Use

Royal Legion club

Dwelling Capacity

5

Green Belt

No

Phasing

2016-2020

 

 

 

 

 

 

Site Ref

H(19)

Site

Langwood House, High Street, Rickmansworth

 Housing Site Allocations

Current Use

Office and parking

Dwelling Capacity

15

Green Belt

No

Phasing

2016-2020

Comments

Part of site is within floodzone. Flood Risk assessment would be required to support planning applications on the site.

Minimum 8m buffer must be provided to Town Ditch.

 

Site Ref

H(20)

Site

Gas Works, Salters Close, Rickmansworth

 Housing Site Allocations

Current Use

Gas Works

Dwelling Capacity

20

Green Belt

No

Phasing

2012-2015

Comments
Part of site is within floodzone. Flood Risk assessment would be required to support planning applications on the site.

Site near to wildlife site. Measures to avoid adverse impacts and enhance biodiversity will need to be provided by developers, supported by adequate ecological survey.

The site lies within Source Protection Zone 1. A preliminary risk assessment to determine whether there is contamination of the site and whether further remediation works will need to be undertaken would be required to support planning applications on the site.

Site Ref

H(21)

Site

Bridge Motors, Church Street, Rickmansworth

 Housing Site Allocations

Current Use

Garage/car sales

Dwelling Capacity

10

Green Belt

No

Phasing

2021-2026

Comments
Part of site is within floodzone. Flood Risk assessment would be required to support planning applications on the site.

The site lies within Source Protection Zone 1. A preliminary risk assessment to determine whether there is contamination of the site and whether further remediation works will need to be undertaken would be required to support planning applications on the site.

Minimum 5m buffer must be provided to ditch on site.

Site Ref

H(22)

Site

Depot, Stockers Farm Road, Rickmansworth

 Housing Site Allocations

Current Use

Water depot / staff accommodation

Dwelling Capacity

60

Green Belt

Yes

Phasing

2016-2020

Comments
Part of site is within floodzone. Flood Risk assessment would be required to support planning applications on the site.

Minimum 5m buffer must be provided to watercourses.

Part of site within a wildlife site.

Measures to avoid adverse

impacts and enhance biodiversity will need to be provided by developers, supported by adequate ecological survey.

The site lies within Source Protection Zone 1. A preliminary risk assessment to determine whether there is contamination of the site and whether further remediation works will need to be undertaken would be required to support planning applications on the site.

Site Ref

H(23)

Site

Pocklington House, Eastbury

 Housing Site Allocations

Current Use

Care home

Dwelling Capacity

30

Green Belt

No

Phasing

2016-2020

Comments

Development depends on suitable replacement for care home being found.

Site Ref

H(24)

Site

The Fairway, Green Lane, Oxhey Hall

 Housing Site Allocations

Current Use

Residential home

Dwelling Capacity

25

Green Belt

No

Phasing

2016-2020

Comments

Site depends on alternative provision being made before it could provide housing.

Site Ref

H(25)

Site

Crescent Club, Hallowes Crescent, South Oxhey 

 Housing Site Allocations

Current Use

Social club

Dwelling Capacity

15

Green Belt

No

Phasing

2012-2015

 

 

 

 

 

 


Site Ref

H(26)

Site

Former Jet Public House, Hayling Road, South Oxhey

 Housing Site Allocations

Current Use

Former public house, now demolished

Dwelling Capacity

10

Green Belt

No

Phasing

2012-2015

 

 

 

 

 

Site Ref

H(27)

Site

Little Furze School, South Oxhey

 

Housing Site Allocations

Current Use

Primary School (now closed)

Dwelling Capacity

75

 

 

Green Belt

Yes

Phasing

2012-2015

Comments

Site adjacent to wildlife site and Local Nature Reserve. Measures to avoid adverse impacts and enhance biodiversity will need to be provided by developers, supported by adequate ecological survey.

 

Site Ref

H(28)

Site

Amenity Space Maylands Road/Ferndown Road, South Oxhey

 Housing Site Allocations

Current Use

Amenity/Play space

Dwelling Capacity

10

Green Belt

No

Phasing

2016-2020

Comments

Development of this site for housing would include reprovision of play area on amenity space at corner of Moortown Road and Northwick Road.

 

 

Site Ref

H(29)

Site

South Oxhey Town Centre

 Housing Site Allocations

Current Use

Town centre uses

Dwelling Capacity

360

 

Green Belt

No

Phasing

2016-2026

Comments
Housing allocation reflects areas shown for residential or mixed use which may include residential as part of the Masterplan for South Oxhey (chapter 9).

Northwick Road Day Centre facility to be re-provided in the local area as part of any development.

Site Ref

H(30)

Site

Grapevine Public House, Prestwick Road, South Oxhey

 Housing Site Allocations

Current Use

Public House and open land

Dwelling Capacity

15

Green Belt

No

Phasing

2021-2026

Comments

Site adjacent to wildlife site and Local Nature Reserve. Measures to avoid adverse impacts and enhance biodiversity will need to be provided by developers, supported by adequate ecological survey.

 

Site Ref

H(31)

Site

Grazing Land at Foxgrove Path/Heysham Drive, South Oxhey

 Housing Site Allocatons

Current Use

Grazing land

Dwelling Capacity

50

Green Belt

Yes

Phasing

2021-2026

Comments

Site adjacent to wildlife site and Local Nature Reserve. Measures to avoid adverse impacts and enhance biodiversity will need to be provided by developers, supported by adequate ecological survey.

 

 

 

Site Ref

H(32)

Site

Rear of Lytham Avenue, South Oxhey

 Housing Site Allocations

Current Use

Open land

Dwelling Capacity

20

Green Belt

Yes

Phasing

2021-2026

 

 

 

 

 

 

Site Ref

H(33)

Site

Land at Woodside Road, Abbots Langley

Housing Site Allocations

Current Use

Open land

Dwelling Capacity

100

Green Belt

Yes

Phasing

2016 - 2021

Comments

Development proposals are to include details of the provision of land serviced for the construction of a primary school at Site S(c)

 

 

Site Ref

H(34)

Site

Fairways Farm Bucknalls Lane, Garston

 Housing Site Allocations

Current Use

Open land

Dwelling Capacity

100

Green Belt

Yes

Phasing

Post 2026

Comments

Part of site is within loodzone. Flood risk assessment would be required to support planning applications on the site

 

 