< Previous | Next >

22 Evidence Base: Document List

Document

Lead Author

Planning Policy

The Enfield Plan Core Strategy 2010 - 2025

LBE

LDF Nov 2010 Proposals Map

LBE

Proposed Submission DMD March 2013

LBE

Proposed Submission DMD Proposals Map March 2013

LBE

Proposed Submission DMD Final Policies Map Booklet

LBE

NEEAAP: Baseline Report 2007 / SA Scoping

LBE

NEEAAP: Issues and Options 2008 / SA

LBE

NEEAAP: Interim AAP 2012 / Consultation Responses

LBE

NEEAAP: SA Scoping Report

LBE

Enfield’s Local Plan Monitoring Report 2011

LBE

Statement of Community Involvement 2006

LBE

Housing

Affordable Housing Viability Study 2009 (Final Version)

Adams Integra

Affordable Housing Viability Study 2009 (Final Version)

 

(Appendices)

Adams Integra

Enfield Housing Trajectory Justification Report (2009)

LBE

Enfield Strategic Housing Market Assessment (2010)

ECOTEC

The London Strategic Housing Land Availability Assessment and Housing Capacity Study 2009 

GLA

The London Strategic Housing Land Availability Assessment and Housing Capacity Study 2009 2009-Appendix One

GLA

Estates Renewal Strategy–Selection Methodology/Approach (December 2013 Cabinet)

LBE

Garage Strategy 2013 (December 2013)

LBE

Ordnance Road development: Kettering Hall and former Ordnance public house site

LBE

Academy Street Application 

LBE

LBE Application – Former Middlesex University Site and Ponders End High Street

LBE

Specialist Needs Housing Baseline Information

LBE

Retail / Town Centres

Enfield – A Study of Town Centres-2007

Nathaniel Lichfield & Partners

Enfield Retail Study Update (2009) 

Nathaniel Lichfield & Partners

Town Centres Uses and Boundaries Review (2013)

LBE

Enfield Retail Study (Procuring Consultants) Proposed 1st Draft by February  2014

TBC

Draft Town Centres SPG January 2013

GLA

London Assembly Response – GLA Draft Town Centres Strategy

LA

LBE Response to Draft Town Centres SPG January 2013

LBE

Consumer Expenditure and Comparison Goods Floorspace Need in London Pre-Publication Report August 2013

Experian

Employment / skills

Enfield Employment Study (2006)

Halcrow

Enfield Employment Land Update-2009

 

Halcrow

Enfield Skills and Employment Strategy

LBE

Employment Land Review, April 2012

Roger Tym & Partners

Industrial Estates Strategy (ongoing) Final Report 2013

PBA

Enfield Employment and Skills Strategy 2013 - 2016 (Ongoing Final Draft December 2013)

LBE

Transport

Core Strategy Transport Assessment/Appendices (2009)

JMP

A1010 Study 

Halcrow

A1010 Corridor Study 

GVA

Upper Lee Valley Transport Study

JMP

Rail Options Study 

Halcrow

Freight by Water Feasibility Study 

LBE

Enfield Cycle Action Plan 2013 

SKM Colin Buchanan

Cycle Routes in Enfield – Oct 13  LB Haringey Cycle Map

LBE

Enfield Greenways Plan – Proposed Routes 2011

LBE

Green Infrastructure and Open Environments: The All London Green Grid SPD March 2012

GLA

NGAP Inspectors Report 2002 Inquiry

ODPM

NGAP Modeling 2013 - Consultant Brief

LBE/TFL

NGAP Member Briefing Note 2012

LBE

Epping Forest – NGAP Officer report

EFDC

Broxbourne – NGAP Officer report 

BBC

Ponders End High Street TFL Project – Consultant Brief (Ongoing  procurement)

LBE/TFL

Ponders End High Street TFL Project – Consultant Brief (Ongoing  procurement) Parsons Brinckerhoff

PB

Ponders End High Street TFL Project  –  Initial Sketch – Issues and Project – Opportunities

PB

Ponders End High Street TFL Project – Ideas Sketch

PB

Ponders End High Street TFL Project – Problems, Opportunities and Issues

LBE

Future Crossing Points Engineering Study

 

NGAP – Background Documents

 

Cycle Routes In Enfield September 2013

LBE

Strategic Map Car Clubs 

LBE

Enfield Mini Holland Bid Document, July 2013

LBE

NGAR Background Documents/ Inquiry

LBE

Brimsdown Riverside Walk Plan 

LBE

Flood risk

Enfield Strategic Flood Risk Assessment Level 1 (2008)

LBE

High level Sequential Test (2009) 

LBE

Surface Water Management Plan-2012

Drain London/ GLA

SFRA Level 2 

LBE

HRA / Ecology

Habitats Regulation Assessment [2009]

LBE

Review of Enfield’s Sites of Importance for Nature Conservation Citations (2013) 

LBE

Appropriate Assessment Screening May2013

LBE

Enfield Biodiversity Action Plan 

LBE

Sustainability / Energy

Enfield Renewable Energy and Low Carbon Study [2010]

AECOM

Lee Valley Heat Network Feasibility Study

LBE

Prefeasibility Study of the Viability of a Decentralised Energy

 

Network in the context of the Upper Lee Valley (2011)

Parsons Brinckerhoff

Enfield 2020 Sustainability Action Plan

LBE

Enfield Air Quality Action Plan

LBE

Conservation / Heritage / Character

Conservation Area Management Proposals (2007)

The Paul Drury Partnership

Conservation Area Management Proposals (2007)

The Paul Drury Partnership

Updated Conservation Area Appraisals (ongoing December 2013) Draft Ponders End Flour Mills, Enfield Lock, Turkey Street CA Appraisal Received

The Paul Drury Partnership

Enfield Heritage Study (2008) 

The Paul Drury Partnership

Enfield Characterisation Study (Feb 2011)

Urban Practitioners

Enfield Urban Design Agenda 

LBE

Areas of Archaeological Importance Review (2013)

LBE

Area of Special Character Boundary Review (2013)

LBE

Report on Location of Tall Buildings and Important Local Views in Enfield (2013) 

LBE

Open space

Open Space Study 

Atkins

Lee Valley Regional Park Framework

Lee Valley Regional Park

Authority Metropolitan Open Land and Green Chain Associated Open Space Review (2013) 

LBE

Open Space Policies Map Paper-2013

LBE

Green Belt Review (2013) 

LBE

Enfield Parks and Open Spaces  Strategy 2010-2020

LBE

Leisure Projects in the NEEAAP – Briefing Note

LBE

Albany Park Masterplan Documents 

LBE

Infrastructure

Infrastructure Delivery Plan April 2013

LBE

Joint Strategic Needs Assessment (ongoing – October 2013)

LBE

Ponders End - Mapping of Community Facilities – 2011

LBE

Other

Viability for CIL and Development Management Document, April 2013 

Dickinson Serle

Economic Strategy 2011

LBE

Enfield’s Local Plan Monitoring Report 2011

LBE

Enfield Food Strategy and Action Plan

LBE

Education – Cabinet Report 051212– Primary Expansion Programme

LBE

Education – Cabinet Report 190613– School Expansion Programme Phase 2 2013/14-20117/18

LBE

Education – Cabinet Report 200612– Strategy for the Provision of Primary Pupil Places

LBE

Education – NEEAAP Briefing Note – School Expansion Programme

LBE

NEEAAP – List of Schools 

LBE

NEEAAP – Schools Location Plan 

LBE

Education - Cap 1 Review 

LBE

Education – Expansion of Childcare Provision Within Children’s Centres

LBE

Enfield Children and Young People’s Plan 2011-2015

LBE

The Foundation Years – Preventing Poor Children Becoming Poor Adults - 2010

HM Gov

Early Interventions – The Next Steps 2011

HM Gov

Early Intervention – Smart Investment/Massive Savings

HM Gov

Early Education and Childcare 2013 

HM Gov

Enfield Play Strategy and Action Plan

LBE

Pre School Provision – Ward Analysis

LBE

Childcare Sufficiency Data (6 Files)

LBE

NEEAAP – Pre School Briefing Paper

LBE

Enfield’s Sport, Physical Activity and Physical Education Strategy 2009-2014

LBE

Enfield Safer and Stronger Communities board Partnership Plan – 2012-13

LBE

Ponders End / Alma Estate

Ponders End: A Framework for Change Aug 2009

LBE / Enfield Strategic Partnership

Ponders End Central Area SPD May 2011

LBE

Ponders End – A Framework for Growth 2009

Studio Egret West

Ponders End Planning Briefs – Feasibility Report

AZ Urban Studio Limited

Alma Masterplan - Submission- Preferred Developer Viability Report

 

Ponders End Water Front Plan – Future Interventions

LBE

Ponders End Water Front Plan – Future Interventions

LBE

Heron Hall Pre-application Masterplan – Former Middlesex University Site, Ponders End

HH

Land Title Heron Hall – Former Middlesex University Site, Ponders End, October 2013

HH/Land Registry

OLF 2 North East Enfield Bid Document

LBE

Ponders End Waterfront – ALGG Proposal

LBE

Consultations - Adjoining Authority /GLA/CLG - LBE Response

Broxbourne Council Waltham Cross Town Center Strategy /LBE response 2012

 

Epping Forest Local Plan Issues and Options /LBE response 2012

 

Lee Valley Regional Park Authority Park Framework/ LBE response 2012

 

Crossrail 2 Strategic Options/LBE response 2013

 

Property Matters

HRA Sites Plan 

LBE

LBE Property Disposals Sites 

LBE

Glyn Road Car Park Proposals 

LBE

Private Industrial Sites Availability 

LBE

NEEAAP – LBE Property – Briefing Note

LBE

 



< Previous | ^ Top | Next >